Does this job need a permit? Usually the answer depends on what is going in, not what is coming out.

Ask about a permit job

Jobs that usually need a permit

Anything that adds a new heater or a new gas line tends to need one. Putting a new wood stove or pellet stove into a house, fitting a gas insert into an old fireplace, adding a vented gas fireplace on a new wall, or rebuilding a chimney above the roofline are the jobs where cities most often want plans or at least a permit and a site visit.

Swapping a worn stove for a new one in the same spot can also need one, because the new stove has its own clearance and venting rules. We read the new stove's install sheet against the room before quoting, so the paperwork and the floor pad agree.

  • New wood or pellet stove in a room that never had one
  • Gas insert or vented gas fireplace, with any gas line work
  • Chimney rebuild above the roof
  • Structural masonry work on the stack

Jobs that usually do not

Sweeping, inspections, replacing a cap, sealing the crown, repointing a few joints, fixing a damper or replacing stove gaskets and firebricks are maintenance. In our experience cities around Duarte do not ask for a permit for that kind of work, but we still confirm when a job sits near the line.

How sign-off fits around the work

When a permit is needed, the quote says so and shows the permit as a separate line. The city inspector may want to see the hearth pad, the clearances and the vent before trim covers them, so we plan the job in stages: install, leave open for the inspection, then finish. You are told up front which stage the inspector needs to see.

South Coast AQMD Rule 445 also bears on wood heat here. It sets no-burn days in the cooler months across Los Angeles County and limits wood burning devices in new construction. It does not stop you repairing the stove you have, but it is a fair thing to weigh when choosing between a new wood stove, a pellet unit or gas.

Fixes with a published figure

These are the usual jobs after a code finding. Permit fees are separate and set by the city.

Finding and stopping a chimney leak
$555 to $3,300
Water diverter on the uphill side
$445 to $1,000
Diverter plus new metal at every roof joint
$665 to $1,650
Gas unit set into an existing firebox
$2,750 to $5,550
Camera check before or after the work
$385
Spark screen cap, fitted
Quoted after we measure

Crowns, liners, dampers, chase tops, flashing alone and stove repairs are quoted in writing per house.

Permit questions we hear

Who files the permit?

The quote says who files it. On most install jobs we prepare the stove and venting details the city asks for, and we tell you which parts need your signature as owner.

Do I need a permit to replace my old wood stove with the same size?

Often yes, because a new stove brings its own clearance and venting requirements. We check with the city for your address and tell you before quoting.

What does the city inspector look at?

Usually the hearth pad, the clearances to walls and trim, the connector and the flue or vent, and any gas line. We plan the work so those are visible on the day.

Can I still burn wood under Rule 445?

On days without a no-burn alert, yes. The rule sets curtailment days in the cooler months; it does not ban the stove you already have.

What if a past job was done without a permit?

We note what we find and what would need to change to meet the current rules. Whether to apply after the fact is between you and the city, and we can explain the options.

Not sure if your job needs a permit?

Describe the work and the city on the contact page. We check with that building department and include the answer in the written quote.

Call (626) 556-9723
Call (626) 556-9723